MD Carrelage
MD Carrelage logo

Contact us

Our standards

The same standards on every job

Every project is different, but the same rigour applies everywhere. We prepare the substrate with care, lay to the standards of the trade and check the finishing.

MD Carrelage job site
01

A well-prepared substrate

Removal, levelling compound, liquid screed, waterproofing: the substrate is prepared before laying, not after.

MD Carrelage job site
02

Careful laying

Layout planning, alignment, finishes: every tile is laid with care, including the very large formats.

MD Carrelage job site
03

Clean grout lines

Clean, even grout lines, a tidy site and a final walk-through together to check every detail.

MD Carrelage job site

Before / after

Slide to compare

Before the work After the work

Free quote

An idea, a plan,
or just a notion?